Two further rooms on the floors below the control room
contained more equipment.


The first two pictures show the main distribution frame.


above left - The Uniselector Room contained the equipment that routed programme sources to destinations. The bays are being installed. above right - some of the programme uniselectors, showing the wiring.


left - a few of the uniselectors used in the
main EMX (Engineering Manual Exchange). Above right - The room
also contained bays of relays.